Pakistan Railways
 




Latest News


Latest Public Notices


Description Date

P.R CHIEF ENGINEER SURVEY AND CONSTRUCTION

Technical Evaluation Report for Feasibility Study of Rail Link for the of Coal by Rail from Afghanistan.

Download File
25 November, 2022

P.R CHIEF EXECUTIVE OFFICER/ SENIOR GENERAL MANAGER

Show Cause Notice NO. E-142/0235/2022/Confdl.5

Download File
23 November, 2022

P.R CHIEF MECHANICAL ENGINEER / LF

Charge Report No. 940-E/2/LF/2021

Download File
23 November, 2022

P.R CHIEF MECHANICAL ENGINEER / LF

JME / Design (bs-17) Risalpur

Download File
23 November, 2022

P.R DEPUTY GENERAL MANAGER

Notice: No. 724-E/12151 (Admin-II)

Download File
23 November, 2022

P.R CHIEF PERSONNEL OFFICER

Transfer posting of BS-20

Download File
22 November, 2022

P.R CHIEF PERSONNEL OFFICER

Transfer posting of BS-19

Download File
22 November, 2022

P.R CHIEF PERSONNEL OFFICER

Transfer posting of BS-17

Download File
22 November, 2022

INCREASE EMPTY HAULAGE CHARGES

empty haulage charges as Rs 168/- instead of 12.10/-

Download File
22 November, 2022

P.R DY DIRECTOR P & P

Notification:

Download File
19 November, 2022

New Arrivals