Pakistan Railways
 




Latest News


Latest Public Notices


Description Date

P.R TECHNICAL EVALUATION REPORT (AS PER RULE 35 OF PPRA 2004)

T.NO.07-0010-00-12-1-2020 DT.12-08-22 (1) Fuse 6 Amp

Download File
13 September, 2022

P.R TECHNICAL EVALUATION REPORT (AS PER RULE 35 OF PPRA 2004)

T.NO. 07-600COACHES-40-0-1-2020 DT.15-07-22 RPM Meter Range

Download File
13 September, 2022

P.R TECHNICAL EVALUATION REPORT (AS PER RULE 35 OF PPRA 2004)

T.NO. 10-0001-00-0-1-2022 DT.03-08-22 Welding Electrodes

Download File
13 September, 2022

P.R TECHNICAL EVALUATION REPORT (AS PER RULE 35 OF PPRA 2004)

T.NO. 07-0010-00-11A-1-2020 DT.19-07-22 Conversion Relay etc.

Download File
13 September, 2022

P.R CHIEF PERSONNEL OFFICER

Transfer posting of BS-17.

Download File
13 September, 2022

P.R CHIEF PERSONNEL OFFICER

Notification

Download File
10 September, 2022

P.R CHIEF MECHANICAL ENGINEER / LF

Notice

Download File
10 September, 2022

P.R CHIEF MECHANICAL ENGINEER / LF

Charge Report

Download File
10 September, 2022

P.R DY CHIEF MECHANICAL ENGINEER/LF

Transfer posting of BS-18.

Download File
10 September, 2022

P.R CHIEF PERSONNEL OFFICER

Transfer posting of BS-17.

Download File
09 September, 2022

New Arrivals