| Description |
Date |
P.R TECHNICAL EVALUATION REPORT (AS PER RULE 35 OF PPRA 2004)
T.NO.07-0014-00-2-1-2020 DT.19-07-22 Cable Cooper Flexible
Download File
|
14 September, 2022 |
P.R TECHNICAL EVALUATION REPORT (AS PER RULE 35 OF PPRA 2004)
T.NO.08-0004-00-0-1-2022 DT.28-07-22 Tip Cemented Carbide.
Download File
|
14 September, 2022 |
P.R TECHNICAL EVALUATION REPORT (AS PER RULE 35 OF PPRA 2004)
T.NO.18-0008-00-0-1-2019 DT.20-07-22 Cloth Drill Cotton.
Download File
|
14 September, 2022 |
P.R TECHNICAL EVALUATION REPORT (AS PER RULE 35 OF PPRA 2004)
T.NO.20-0010-00-0-1-2021 DT.06-06-22 Nickel Cadmium Batteries.
Download File
|
13 September, 2022 |
P.R TECHNICAL EVALUATION REPORT (AS PER RULE 35 OF PPRA 2004)
T.NO.07-0010-00-12-1-2020 DT.12-08-22 (1) Fuse 6 Amp
Download File
|
13 September, 2022 |
P.R TECHNICAL EVALUATION REPORT (AS PER RULE 35 OF PPRA 2004)
T.NO. 07-600COACHES-40-0-1-2020 DT.15-07-22 RPM Meter Range
Download File
|
13 September, 2022 |
P.R TECHNICAL EVALUATION REPORT (AS PER RULE 35 OF PPRA 2004)
T.NO. 10-0001-00-0-1-2022 DT.03-08-22 Welding Electrodes
Download File
|
13 September, 2022 |
P.R TECHNICAL EVALUATION REPORT (AS PER RULE 35 OF PPRA 2004)
T.NO. 07-0010-00-11A-1-2020 DT.19-07-22 Conversion Relay etc.
Download File
|
13 September, 2022 |
P.R CHIEF PERSONNEL OFFICER
Transfer posting of BS-17.
Download File
|
13 September, 2022 |
P.R CHIEF PERSONNEL OFFICER
Notification
Download File
|
10 September, 2022 |