Pakistan Railways
 




Latest News


FEASIBILITY STUDY FOR 168 KM BROAD GAUGE (1676 MM) RAIL CONNECTIVITY (VIA KOHAT – THAL – PARACHENAR – KHARLACHI) WITH AFGHANISTAN.

No of Views 160 No of Downloads 26
Designation:
Chief Engineer / Survey & Construction
Department
Chief Engineer / Survey & Construction
Details

Feasibility study for 168 km broad gauge (1676 mm) RAIL connectivity (Via KOHAT – THAL – PARACHENAR – KHARLACHI) with AFGHANISTAN. No.844-W/636(S&C) / Tender/2022

Provide Details for Download

Contact Person
Company Name
Contact Number
Email Address
Enter the code: